With our mission " working with hearts "Our Company serve every order from client or customer, we always take care with carefull and sincerity of heart.
Needs Our Customer always we are heard for we found solution and way out for reach the goal of Project.
In every project we accept, we are learning and investigation for make best procedure. We always care about Standard Operational Procedure for every single project. We care about Healthy and Safety Environment.
Process for Installation Engine Power Plant need man power with skill and experience for doing execution, because with big budget project we are need maintain schedule our customer is working supposed to be nicely.
Installation engine involving various things of systems; from mechanical and electrical system, from engine, fuel, cooling, insulation, heating oil, panel, transformer, grounding, protection system.
Wijaya Inti Sejahtera had many experience for doing client or customer project with our engineering and technical, we had finishing many project from PLN Project, IPP, Multi National Company Project.
We are provide and service EPC Project ( Engineering, Procurement and Service) for doing bussiness Power Plant.
From Engineering to make Desain and Consept of Power Plant; Procurement to help client for advise and assist to choose equipment with based quality and budget cost; Construction doing installation of Power Plant included Civil and Mechanical Electrical works until Commisioning
We are doing installation Engine Power Plant, Fuel from Gas, Diesel, Dual Fuel Engine ( Gas and Diesel), MFO
We are take care engine on foundation from reposition, leveling, allignment engine, included filling up chock fast for foundation engine, installation plate form engine, auxiliary engine (radiator, muffler, exhaust ducting )
Panel Electrical for Power Plant is very important. Theya are functions as the power receptacle of the transformer and further distributes the power to a low voltage sub-distribution panel or LVSDP (Low Voltage Sub Distribution Panel) using Air Circuit Breaker or Molded Case Circuit Breaker.
The sub-distribution panel serves to distribute the power it receives to equipment that uses electrical power. Wijaya Inti Sejahtera have experience for Installation Panel Electrical for Power Plant, from : Panel LV MDP, Panel Synchronize Genset, Panel Control Motor, Panel Lighting, Panel Capacitor Bank.
piping systems in power plants such as arteries in the human body. Pipes connect fuel from the tank to the engine. Connect the water tank to the radiator and to the water pipes around the engine, as well as the air pipes for the engine combustion system.
Wijaya Inti Sejahtera had experience to doing installation piping for fuel, water, air, wastage. And we are always support for your bussiness and give your solution.
With the installation of a good and correct piping system according to the standard, it will produce maximum budget efficiency and electricity production
Pipe insulation is needed to maintain the temperature of the material that passes through pipes such as oil, water or air.
Steam Pipe Insulation is the main purpose of the use of boiler engines in order to obtain an efficiency level, but in addition to doing steam pipe insulation also functions as anti-heat safety. The most important thing is the selection of materials and Wijaya Inti Sejahtera is experience for doing of steam pipe insulation services.
A power plant is a vital facility related to fuel, heat, high voltage electricity, high pressure, etc., which has a high potential for fire hazard. Therefore, the first protection facility for this potential is a must.
Protection systems against fire hazards in electricity centers can generally be grouped into two (2) large groups, namely firefighting systems (FF) and fire alarm system (FA).